List of New & Upcoming Projects in Gujarat – 2015

New Projects in Gujarat 2015

Click Here Download Sample Report

This the summarized list of New Industrial Projects Coming up in Gujarat

The original report ( in excel format)  has all details including,

  • Promoting Company
  • Project Name
  • Capacity,
  • Investment Proposed,
  • Location, State,
  • Current Status,
  • Project Details,
  • Commissioning Schedule,
  • Contact Address,
  • Contact Person’s Name,
  • Email ids,
  • Telephone and
  • Fax numbers.

Sub Sector

Project Capacity

Current Status

Company name

Industrial Products Die Forging Plant (15,000 tonnes) Commissioned Sanghvi Forging & Engineering Ltd
Petrochemicals Carboxy Methyl Cellulose (300 MTPM), Micro Crystalline Cellulose powder (200 MTPM), Hydroxy Ethyl Cellulose (100 MTPM), Hydroxy Propyl Methyl Cellulose (25 MTPM), Methyl Cellulose (100 MTPM), Ethyl Cellulose (25 MTPM Environment Clearance Underway Hindusthan M-I Swaco Ltd
Petrochemicals Methylamine (100 TPD) Land Acquisition Stage Alkyl Amines Chemicals Ltd
Industrial Products Solar Water Heater (15 millioj litres / annum ) Construction Underway Hiramrut Energies Pvt Ltd
Refineries Refinery (13.7 mt – 18 mt) Pre Project Activities Underway Indian Oil Corporation Ltd
Steel TMT Bars ( 2450 TPM to 12000 TPM ) Environment Clearance Underway Vinayak TMT bars Pvt. Ltd
Industrial Products Condensors (7,500 units / year) Pre Project Activities Underway Frascold India Pvt Ltd
Chemicals Chemical Construction Underway BASF India Ltd
Fertilizer Ammonia (2,250 tpd), Urea (3,500 tpd) Land Acquisition Stage The Gujarat State Fertiliser Corporation
Solar Energy 25 MW Pre Project Activities Underway Veer Energy and Infrastructure
Vehicles Manufacturing Multi-Purpose Vehicle (1.10 lakh units per annum) Pre Project Activities Underway General Motors
Vehicles Manufacturing Three wheeler (24,000 units per annum – 48,000 units per annum) Pre Project Activities Underway Atul Auto
Pipelines Pipeline (42 NB x 39 kms approx.) Bids Invited Gujarat State Petronet Ltd
Chemicals Kaolin Powder Pre Project Activities Underway Ashapura Minechem Ltd
Home Appliances DVD Players, Home Theaters 300000 Nos. Environment Clearance Underway Force Appliances Pvt Ltd
Chemicals Insecticide (25 MT) Environment Clearance Underway Isagro (Asia) Agrochemicals Pvt Ltd
Polymers Polybutens 20000 (MTPA) Environment Clearance Underway Gujarat Polybutenes Pvt Ltd
Chemicals Agrochmical Intermediates (9,375 TPA), Captive Power (3 MW), Turbine (2 MW) Environment Clearance Underway Sajjan Specialty Ltd
Ceramics Ceramics (3 million square mtrs/year) Pre Project Activities Underway Somany Ceramics
Steel SS Flats (12,000 MTPM) Awaiting Environment Clearance AB Rolling Mills Pvt Ltd
Chemicals Ethyl Cellulose (20 TPM to 99.69 TPM) Awaiting Environment Clearance Asha Cellulose (I) Pvt Ltd
Chemicals Laminated Sheets (1800 MTPM) Awaiting Environment Clearance Apoorva Laminates Pvt Ltd
Polymers Synthetic Resin (15,000 MTPM) Awaiting Environment Clearance Macro Polymers Pvt Ltd
Polymers Particle Board (80,000 Sheets/Month) Awaiting Environment Clearance Salasar Agropanel Pvt. Ltd
Pharmaceuticals Bulk Drugs Awaiting Environment Clearance Krishanj pharmaceuticals Industries
Industrial Products Steel Scrap Shredding (40 tonne-an-hour) Pre Project Activities Underway MSTC Ltd
Oil Exploration Oil Jetty (3.4 MTPA) Bids Invited KandlaPortTrust
Steel Aluminium Smelter (1 MTPA) Alumina Refinery (0.5 MTPA) JV Agreement Signed Gujarat Mineral Development Corporation Ltd
Thermal – Coal Fired 2×660 MW Environment Clearance Received Universal Crescent Power Pvt Ltd
Water Treatment Water (336,000 tonnes / Day) Pre Project Activities Underway Hitachi
Resins Synthetic Resin (15,000 MTPM) Environment Clearance Underway Macro Polymers Pvt Ltd
Chemicals Synthetic Chemicals Environment Clearance Underway Ahan Add Chem Pvt Ltd
Pharmaceuticals Bulk Drugs Environment Clearance Underway Krishanj pharmaceuticals Industries
Thermal – Coal Fired 1200 MW Land Acquisition Stage Videocon Industries
Nuclear 2×700 MW Construction Underway Nalco Power Company Limited
Chemicals Agro Chemicals & Intermediates (155 MTPD) Environment Clearance Accorded Cropnosys India Pvt Ltd
Resins Phenol Formaldehyde Resin (87.5 MTPA), Melamine Formaldehyde Resin (37.5 MTPM) Environment Clearance Accorded Mahadev Laminate Pvt Ltd
Pharmaceuticals Drug (655.40 MTPM to 1480 MTPM) Environment Clearance Accorded Lupin Ltd
Pharmaceuticals API Bulk Drug (1.455 TPM) Environment Clearance Accorded Swati Spentose Pvt Ltd
Fertilizers 500,000 tpa of single super phosphate (SSP) Pre Project Activities Underway Chambal Fertilizers and Chemicals Ltd,
Cement Clinker Production (5.0 MTPA to 5.7 MTPA), Cement (3.975 MTPA to 8.0 MTPA), Limestone Mine (7.84 MTPA to 8.73 MTPA), coal based thermal power plant (92 MW to 104) MW and 4 MW waste heat based power plant. Environment Clearance Awaited Ultratech Cements Ltd,
Thermal – Coal Fired 20 MW captive power Environment Clearance Awaited Balkrishna Industries to set up 20 MW CPP inGujarat
Ceramics 12 lakh pieces of sanitary items Land Acquisition Stage Hindustan Sanitaryware & Industries Ltd,
Auto Components Multple Projects and Capacities Under Implementation Supreme Industries Ltd,
$Industrial Products preengineered metal buildings Conceptual Stage Interarch Building Products Ltd,
Pharmaceuticals Generic drugs Work Commenced Alembic Pharma Ltd,
Polypropylene 3500 tpa to 5400 tpa Planning Zenith Fibres Ltd
Steel Steel Wires ( 60,000 TPA) Land Acquisition Stage Usha MartinIndia
Industrial Products 15,000 tpa Pre Project Activities Underway Sanghvi Forgings & Engineering Ltd
Auto Components 100,000 units / per annum of automotive and engine/gearbox Construction Underway PSA Peugeot Citroen
Steel Steel Tubes (1.25 lakh tpa) Pre Project Activities Underway APL Apollo Tubes
Glass Glass (160 tpd) Advanced Stages of Commissioning Piramal Glass Ltd
Chemicals Fatty acid derivatives of natural oil ( 11200 TPM), Refined Glycerine ( 3000 TPM), Soap noodles ( 9000 TPM), Rude Pitch (Fatty Acid) ( 900 TPM) Environment Clearance Awaited Shubhal Industies Pvt. Ltd
Paper 1.83 lakh tpa to 3.85 lakh tpa Under Implementation Rainbow Papers Ltd
Industrial Products 1.0 million tpa Fund Mobilization Stage AVR Valves Pvt Ltd
Vehicles Manufacturing Passenger Cars ( 1.65 lakh units / year) MoU Signed PSA Peugeot Citroën,
Fertilizers 100,000 tpa Under implementation Archean Group of Companies,
Paper 183000 tpa to 400000 tpa. Conceptual Stage Rainbow Papers Ltd
Cement 1,08,000 MTPA Environment Clearance Awaited Dhara Cement India Pvt ltd
Solar 25 MW Contract Awarded Louroux Bio Energies Limited
Sugar 1,800 tcd Planning Kaveri Vibhag Sahakari Khand Udyog Mandli Ltd
Vehicles Manufacturing 24,000 units of 600-1,000 tonnes Under Implementation Atul Auto Ltd
Power Plant Equipment WindTuribineTowers Pre Project Activities Underway Fedders Lloyd Corporation Ltd
Pharmaceuticals Pharmaceutical intermediates Environment Clearance Awaited Allchem Laboratories Ltd
Ports Develop a jetty Feasibility Study Underway PSL Limited
Power Plant Equipment Power Equipment Pre Project Activities Underway HitachiHi-Rel Power Electronics Pvt
Construction Machinery Cranes (60 units/year) Work Commenced Anupam-MHI Industries Ltd
Thermal – Coal Fired Kutchh Power Generation Ltd
Organic Chemcials Arochemical Intermediates (300 tonnes) Fund Mobilization Stage Hemani Industries Ltd
Wood Products Plywood (30,000 CBM), Laminate(30,000 CBM), Veneer and Allied products Under Implementation Century Plyboards (India)
Miscellaneous Anodised cookware (5 million pieces), Stainless steel cookers (2 million Pieces) Land Acquisition Stage TTK Prestige Limited
Solar Solar photovoltaic based power plant (10 MW) Bids Invited Waa Solar Pvt Ltd
Chemicals 20,000 tpa. sodium chlorate crystals Work Commenced Gujarat Alkalies & Chemicals Ltd
Thermal – Waste to Energy Coke Oven based Waste Heat Recovery power (60 MW) Bids Invited Saurashtra Power Pvt Ltd
Cement Cement (200 tpd to 2500 tpd), Limestone/Clinker (11.55LacMT), Clay (0.82 Lac MT),IronOre(0.41 Lac MT), Coal (1.24 Lac MT), fly ash (2.25 Lac MT) and Gypsum (0.45 Lac MT) Environment Clearance Accorded Shriram Cement Ltd
Wood Products Greenfieldplywood Land Acquisition Stage Century Plyboards (I) Ltd
Thermal – Coal Fired Coal-based super-critical thermal power (4000 MW) Under Implementation Universal Crescent Power Ltd
Miscellaneous Kitchen appliances Land Acquisition Stage TTK Prestige Limited
Vehicles Manufacturing Car Conceptual Stage Bajaj Auto Ltd.,
Thermal – Coal Fired Thermal Power (125 MW) Pre Project Activities Underway Gokul Refoils and Solvent
Pesticides Pesticides (2100 tpa to 4200 tpa) Land Acquisition Stage Dhanuka Agritech Limited,
Pesticides Pesticides (10,000 tonnes) Under Implementation InsecticidesIndia,
Man Made Fibres Polyester Textured Yarn (75,966 MTPA) Environment Clearance Accorded DNH Spinners Pvt. Ltd,
LNG terminal LNG import terminal ( 5.0 million tpa) Work Commenced Gujarat State Petroleum Corp Ltd,
Petrochemicals Engineering Plastics (15,000 tpa) Pre Project Activities Underway Gujarat State Fertilizers & Chemicals Ltd
Solar 25 MW Advanced Stages of Commissioning GMR Gujarat solar Power Pvt Ltd
Agricultural Machinery Mini Tractors ( 1800 units to 2500 units per year) Recently Commissioned Mahindra & Mahindra Ltd
Man Made Fibers Polyester Yarn (547250 MT), Captive Power (32.04 MW) Planning Shubhalakshmi Polyesters Ltd,
Oil exploration Oil exploration Environment Clearance Accorded Jay Polychem (India) Ltd
Wood Laminated Particle Board (180 cu.mtrs) Planning Jason Dekor Pvt. Ltd.
Solar Solar Power ( 15 MW) Sunborne Energy Services,
Manmade fibres POY (32500 tpa) Environment Clearance Accorded Kejriwal Geotech,
Thermal – Coal Fired 260 MW Environment Clearance Accorded Narmada Thermal Power Ltd,
Petrochemicals See Project History Under Implementation ONGC Petro additions Limited
Steel Electrical Steel ( 200,000 tpa) MoU Signed China Steel Corporation India Pvt Ltd
Textiles Textiles (40 million meters to 196 million meters ) Planning Pradip Overseas,
Agricultural Machinery 300 tractors Planning Amul Industries Pvt. Ltd,
Vehicles Manufacturing Vehicles ( 240,000 units/ year), Diesel Engines ( 270,000 units/year) Construction Underway Ford India Pvt. Ltd,
Industrial Products See Project History Pre Project Activities Underway Falcon Pumps Pvt. Ltd,
Thermal – Coal Fired 1200 MW PPA Signed Petronet LNG Ltd
Resins 1500 tpm Environment Clearance Accorded Contact : Salasar Agropanel Pvt. Ltd
Oil exploration Onshore exploratory drilling (8 Wells) Environment Clearance Accorded Vasundhra Resources Ltd
Pesticides 200 tpm Environment Clearance Awaited Meghmani Finechem Ltd
Thermal – Coal Fired 16 MW Environment Clearance Accorded Nirma Ltd,
Chemicals Tri Sodium Phosphate (12.5 MT/Month), Sodium Thio Phosphate (12.5 MT/Month) Planning Mamta Polycoats Ltd,
Resins 1000 tonnes Planning Gujarat Colourlam Pvt. Ltd
Polymers 10,000 tpa Planning Prime Comfort Ltd,
Chemicals See Project History Planning Lubrizol (India) Limited,
Thermal – Cogeneration 15 MW Planning NR Agarwal Industries Ltd,
Chemicals 850 MT/month to 1000 MT/month Environment Clearance Accorded Asahi Songwon Colors Ltd.
Ports See Project History Environment Clearance Accorded Indian Farmers Fertiliser Cooperative Limited (IFFCO)
Industrial Products See Project History JV Agreement Signed EPP Composites Pvt. Ltd,
Aerospace Components Aersospace Components Planning Pipavav Shipyard Limited,
Paints 10 million liters / annum Planning HEMPELIndia
Thermal – Coal Fired 3300 MW Bids Invited Kutchh Power Generation Limited
Hospitals See Project History Planning Fortis Healthcare Ltd
Steel Steel Products Environment Clearance Awaited AB Rolling Mill Private Limited
Polymers Continuous Polymerization (CP) 153300 MTA Under Implementation Raj Rayon Industries Ltd,
Sugar 1,800 tccpd Planning Kaveri Vibhag Sahakari Khand Udyog Mandli Ltd
Solar 500 MW Planning Gujarat Power Corp
Solar 50 MW Planning Godawari Power And Ispat Ltd,
Solar 100 mw Pre Project Activities Underway Konark Gujarat PV Private Limited
Solar 100 mw Pre Project Activities Underway Konark Gujarat PV Private Limited
Industrial Parks See Project History MoU Signed Mahindra Lifespace Developers Limited
Railways See Project History MoU Signed
Aluminium Aluminium Smelter (500,000 tpa), Alumina ( 1 million toa) JV Agreement Signed Gujarat Mineral Development Corp
Oil exploration See Project History Announcement Oil & Natural Gas Corporation,
Petrochemicals See Project History MoU Signed Kemrock Industries and Exports
Sugar 1000 tpd Financial Closure Achieved United Sugars
Glass 160 tpd Pre Project Activities Underway Piramal Glass Limited
Chemicals Fatty Amines (100 MTM to 500 MTM), Speciality Chemicals (160 MTM to 1200 MTM) Environment Clearance Awaited Indo Amines Ltd
Polymers Poly Staple Fiber (1,08,000 TPA), Coal Based Power Plant Expansion (18 MW to 21 MW) Environment Clearance Awaited Garden Silk Mills Ltd
Glass 160 tpd Pre Project Activities Underway Piramal Glass Limited
Refineries Koyali refinery 13.7 million tpa to 16-18 million tpa Feasibility Study Underway Indian Oil Corporation Ltd
Thermal – Gas Based Gas Based Combined Cycle Power 3X400 (1200) MW Environment Clearance Awaited Gujarat State Electricity Corporation Ltd
Solar 10 MW Recently Commissioned Green Infra Ltd
Water Treatment Water Treatment ( 1,600 Cu.mtrs/ day) Pre Project Activities Underway Indian Oil Corporation Ltd
Refineries Refinery Expansion (13.7 million tpa to 18 million tpa) DPR Preparation Underway Indian Oil Corporation Ltd
Pipelines Pipeline (217 kms) Advanced Stages of Commissioning Indian Oil Corporation Ltd
Thermal – Gas Based gas based power (17.46 mw) Environment Clearance Accorded SVGI Gas Power Project
Thermal – Coal Fired Coal based captive power (25 MW) Environment Clearance Accorded SuratSuper Yarn Prak
Man made fibres 750 tpd & 2 M Environment Clearance Accorded Eagle Fibres
Chemicals 2600 tpm Environment Clearance Awaited KGN Bio – Tech Limited
Petrochemicals 72,000 tpa to 120,000 tpa Environment Clearance Awaited INEOS ABS (India) Ltd
Thermal – Gas Based 7200 mw Environment Clearance Awaited Bharuch Power Ltd
Steel 225000 tpa Environment Clearance Awaited Jindal Saw Limited
Steel 1 million tpa Pre Project Activities Underway Good Luck Steel Tubes
Power Plant Equipment 400 sets of 850 Kw Construction Underway Gamesa Wind Turbines Pvt Ltd
Pesticides 24,000 tpa Pre Project Activities Underway Jubilant Lifesciences Ltd
Solar 40 mw Construction Underway PLG Power Limited
Organic Chemicals 700 tpm Environment Clearance Awaited Narayan Organics Pvt. Ltd
Solar 5 mw Bids Invited Gujarat Power Corporation Ltd
Industrial Products Forgings (15,000 tpa) Advanced Stages of Commissioning Sanghvi Forging & Engg Ltd
Highways 101 Kms Financial Closure Achieved GVK Bagodara Vasad Expressway Ltd
Power Plant Equipment 2.3 MW Pre Project Activities Underway Siemens Ltd
Ports 8 MMTPA Pre Project Activities Underway KandlaPortTrust
Chemicals Polyols MoU Signed GujaratAlkalies and Chemicals Ltd
Thermal – Gas Based 655 MW Under Implementation CLP Power India Private Limited
Man Made Fibres viscose staple fibre ( 1.2 lakh tpa) Work Commenced Grasim Industries Ltd
Chemicals Caustic Soda ( 182,500 tpa) / Captive Power Plant ( 60 MW) Work Commenced Grasim Industries Ltd
Chemicals Acetic Acid ( 1.0 million tpa) Feasibility Study Underway Indian Oil Corp Ltd
Steel 100,000 tpa to 150,000 Work Commenced Kamadenu Ispat Ltd
Industrial Products 36,000 MTPA to 1,50,000 MTPA Environment Clearance Accorded Orient Abrasives
Paper 1,000 tonnes Pre Project Activities Underway Khanna Paper Mills Ltd
Polyester Fibres 2.3 million tonnes Pre Project Activities Underway Reliance Industries Limited
Asbestos Products 3,600 MTPA Environment Clearance Accorded Bhakti Associate
Wind 15 MW Bids Invited GAIL(India) Limited
Chemicals 77,000 mtpa Advanced Stages of Commissioning Galaxy Surfactants Ltd,
Hotels 5 Star Hotel ( 240 Rooms) Awaiting Statutory Clearances NG Corporation
LNG Terminal LNG Import ( 3 million tpa) Awaiting Statutory Clearances Swan Energy Ltd
Chemicals

If you wish to get a copy, Click Here  or mail us at subscription@indscan.com

Related Posts Plugin for WordPress, Blogger...

Switch to our mobile site